Swimming pool Denmark

Project

Swimmingpool project in Denmark

Date
Category
Swimming pool
About This Project

This Swimming pool with 3 basins was realized and opened in 2018. Together with our Danish partner we have designed an air handling system to create a comfortable  climate with low energy consumption. Three air handling units with a total air amount of 60.000 m3/h take care of recirculation, ventilation and proper humidity level in the building.  The composite air handling units are equipped with energy efficient coated EC fans and the plate heat exchanger is coated to prevent corrosion.

The temperature control within the building is designed by Climotion according to the BaOpt systems which results in a high comfort level, low air velocities and low evaporation.